Division

  • Hydraulics and sanitation
  • Structures and constructions

Client

Project duration

2017 – 2018
  • Preparation of the Hydraulic Detailed Engineering and Structures for tenders for the expansion of the highway bridge over the Río Lujan.
  • Road design review and construction stages.