Division

  • STRUCTURES AND CONSTRUCTION
  • HYDRAULICS AND SANITATION
  • TRANSPORT AND LOGISTICS

Client

logo-ausa-negro

In collaboration with EEPP S.A.

Project duration

6 months
(2010)

Multidisciplinary team coordination and preparation of detailed engineering reports and drawings):

  • Topographic and photographic surveys. 
  • Geometric highways design and traffic control.
  • Structural design.
  • Stormwater drains system.
  • Urban/architectural design.