Division

  • STRUCTURES AND CONSTRUCTION

Client

logoSubte

In collaboration with AC&A S.A. and METRA Ingenieros

Project duration

14 months
(2015-2016)

Finite elements modeling of junctions and singular structures for Phase 2 (Center): Lines B and D undercrossings, Perón street stormwater main undercrossing, Natural and forced convection and pumping wells. Stability analysis, geotechnical design, sizing of concrete structures:

  • Geotechnical engineering design (reports).
  • Structural calculation reports.
  • Building Stability reports.