Division

  • Hydraulics and sanitation
  • Transport & Logistic

Client

In collaboration with Port Consultants Rotterdam (Netherlands), INA (Argentina), Leo van Rijn (Netherlands) and DHI (Denmark)

Project duration

6 months

(2017)

  • Terminal scan
  • Market study
  • Fleet and cargo forecasts
  • Port vision
  • Cost estimation and phased development
  • Port infrastructure preliminary design
  • Surveying campaign coordination
  • Hydrodynamic and hydrosedimentological studies