Division STRUCTURES AND CONSTRUCTION TRANSPORT AND LOGISTICS Client Project duration 3 months (2010) Provisional structures detailed engineering (walkways, platforms) for pile driving: Calculation reports for metal structures. Detailed engineering drawings.