Division

  • STRUCTURES AND CONSTRUCTION
  • HYDRAULICS AND SANITATION
  • TRANSPORT AND LOGISTICS

Client

logo-ausa-negro

In collaboration with EEPP S.A.

Project duration

28 months
(2010-2012)

Coordination of multidisciplinary team and preparation of engineering documentation (reports and plans) for tender:

  • Topographic and photographic surveys. 
  • Geometric road design and traffic and lighting studies.
  • Hydraulic and electromechanical design of stormwater drainage with detention reservoirs and pumping stations.
  • Structural design.
  • Urban/architectural design.