Division STRUCTURES AND CONSTRUCTION Client Project duration 40 months (2012-2016) Detailed engineering and construction documents for the construction of reinforced concrete structures of a wastewater treatment plant for a population of 90,000: Finite element analysis. Structural calculation reports. Construction plan.